NSW

environmental test for property purchase

iEnvi were engaged by a client to complete a limited soil investigation for the purpose of pre-purchase due diligence at a property currently used as an open car parking facility, intended for redevelopment as a materials storage and a soil conveyor system. The purpose of this PSI and soil investigation was to assess if there

read more
asbestos due diligence

A major coal mining client engaged iEnvironmental Australia to undertake asbestos monitoring in accordance with an existing Asbestos Management Plan, which required annual inspection of a single electrical control room asbestos sheeting.   A local contractor we work with regularly was engaged and iEnvi specialists project managed and reviewed their report, to save on the

read more
church development application environmental

iEnvi was engaged by a community group to undertake a preliminary site investigation and soil sampling  (PSI) at a property in western Sydney) for the purpose of obtaining development consent for utilising the property as a place of worship.   iEnvi has a 100% development approval record for our preliminary site investigations, and completed a

read more

iEnvi were engaged by a petroleum distribution client to complete a lease baseline investigation for the lease renewal for a property and continued operation as a petrol station, including compliance with the Protection of the Environment Operations (Underground Petroleum Storage Systems) Regulation 2014.   The primary objective of the lease baseline investigation was to inspect

read more
Snowy Mountains groundwater

Groundwater monitoring was required by the NSW Office of Environment and Heritage, due to a decommissioned underground storage petroleum storage (UPSS) at a ski lodge in Perisher Valley (within Snowy Mountains National Park).   Groundwater was sampled by iEnvi at the request of a Ski Lodge company. The sampling was conducted using low flow sampling

read more

The NSW Environmental Protection Agency (EPA) updated the Contaminated Land Management Compliance Statement in July 2018. The purpose of this update was to set out specific powers and tools that the EPA can use to enforce compliance with the Contaminated Land Management Act 1997. Let’s take a closer look at those powers and tools. The

read more
iEnvi offers a 24 hour site reporting service backed by highly qualified scientists and reporters from across the globe. iEnvi recently provided a preliminary site investigation and groundwater monitoring reports for a petrol station redevelopment on an extremely tight deadline.

iEnvi came to the rescue and provided a ridiculously fast and thorough preliminary site investigation and groundwater monitoring reports for a petrol station redevelopment site on a tight deadline to meet settlement dates. These site reports were required as environmental due diligence for financing an expansion of the successful petrol station, including acqusition of the surrounding

read more

Recently iEnvironmental Australia (iEnvi) was contracted by a Sydney western suburbs Council to manage waste contaminated soil at a sports park in NSW. Soil excavated at a sportsfield had been excavated for light footings. The soil contained elevated polychlorinated biphenyl concentrations and asbestos and fill rubble, associated with historical industrial fill, and environmental consultants had

read more

iEnvironmental Australia (iEnvi) was recently engaged by an architect firm to conduct a preliminary site investigation on a property they wanted to convert into a child care centre. Preliminary site investigations are required for obtaining development consent for most projects. The developers requested a desktop only preliminary site investigation, and as such, a site visit

read more