Machete

UPSS abandonment underground fuel tank

iEnvi was engaged by a local restaurant owner to manage the decommissioning and abandonment of three underground storage tanks (USTs) at a restaurant in Hervey Bay, QLD. The site is currently on the QLD Environmental Management Register (EMR) for historical use of the site as a commercial service station. The client wished to have the

read more
construction-environmental-management

iEnvi were engaged by an engineering firm on behalf of a regional council to undertake a Construction Environmental Management Plan (CEMP) and components of an Environmental Impact Statement (EIS) for the construction of a sports complex. The CEMP was required for development approval of the site.  The construction processes included clearing of existing vegetation, major

read more
Groundwater Remediation Solvent UST Removal

Contaminated properties are rarely understood by businesses, and always a significant problem for businesses to manage. They can also be opportunities! Selling your business or property (or needing to increase property asset value for borrowing): Leverage lenders with a fully itemised remediation program in stages from start to finish with low, and high cost ranges, after

read more

Microbiologically Influenced Corrosion (MIC) is a term that refers to the change (either acceleration or inhibition) in corrosion caused by the presence of microorganisms (bacteria, yeast, fungi), typically as a result of their metabolic activities. The most commonly known outcome of MIC is a dramatic acceleration in the rates of corrosion, typically in the form

read more
waste classification

  iEnvi was engaged by a local council in the Southern Highlands to conduct an insitu Waste Classification (WC) and an excavated natural material (ENM) Assessment of soil beneath a segment of road to be redeveloped. The purpose of the WC and ENM Assessment was to characterise the soils beneath the segment of road planned

read more
erosion sediment control

Envi was engaged by a construction company to review and update the erosion sediment control plan (ESCP) as part of the construction environmental management plan (CEMP) for a State Significant development site in the Mornington Peninsula, Victoria. The update was necessary to address inadequate erosion sediment controls of the original ESCP identified at the site.

read more
Michael Nicholls iEnvironmental Australia

  Hello and Happy New Year for 2020 to our clients and friends! It has taken a while, but welcome to our inaugral iEnvi Machete newsletter, where you will see key information and news relating to environmental regulation, contamination and unique cleantech. iEnvi has gone through fast growth since registering in April 2018 as a

read more
sustainable sewage technology

  Turlinjah is a small community of 70 people on the NSW South coast of Australia. Previously sewage was collected in septic tanks located less than 200 meters from extensive oyster leases in the Tuross Lake. There was concern about the untreated septic discharge into this sensitive receiving environment. Monitoring of the area showed levels

read more

iEnvi was engaged by an international manufacturing company to undertake preliminary site investigations at two coatings manufacturing facilities in Victoria and Western Australia. The company wished to purchase the sites and required an assessment of the level of environmental and human health risk associated with the coatings manufacturing processes and chemicals at the sites. iEnvi

read more
pollution incident management plan

A Pollution Incident Response Management Plan (PIRMP) is a plan that can be immediately implemented following a pollution incident to reduce risks to human health and the environment. It is a legislative requirement for all Environmental Protection Licence holders in NSW to have a PIRMP in accordance with section 153A of the Protection of the

read more